Sign In | Join Free | My benadorassociates.com
China YUHONG HOLDING GROUP CO., LTD logo
YUHONG HOLDING GROUP CO., LTD
Heat Exchanger / Air Cooler / Pressure Vessel / Fired Heater
Verified Supplier

1 Years

Home > Pressure Vessel >

ASME Sec VIII Div 1 Vessel, S32750 Shell with PWHT for Mining Blowdown System H₂S Environments

YUHONG HOLDING GROUP CO., LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ASME Sec VIII Div 1 Vessel, S32750 Shell with PWHT for Mining Blowdown System H₂S Environments

Brand Name : YUHONG

Model Number : Steam Blow Back Vessel

Certification : ASME VIII DIV.1 , PED, API , NB

Place of Origin : China

MOQ : 1Set

Price : 5,000 -- 100,000 USD

Payment Terms : L/C, T/T

Supply Ability : 50SETS/MONTHS

Delivery Time : 45---150 DAYS

Packaging Details : Pallet

Plate material : SA240 UNS S32750

Plate head : SA240 UNS S32750

Forgings : SA182 F53

Pipes : SA790 UNS S32750

Contact Now

ASME Sec VIII Div 1 Vessel, S32750 Shell with PWHT for Mining Blowdown System H₂S Environments

YUHONG Steam Blow Back Vessel is engineered to meet the rigorous operational demands of the mining industry. Constructed with a S32750 duplex stainless steel shell, this vessel is designed for durability and high resistance to corrosion, especially in environments with aggressive chemicals and high pressures. Certified with the ASME U-Stamp, the vessel complies with ASME Section VIII Division 1, ensuring safety, reliability, and performance in industrial applications.

ASME Sec VIII Div 1 Vessel, S32750 Shell Technical Specifications

Parameter Details
Design Code ASME Section VIII Division 1
Material Duplex Stainless Steel S32750
Design Pressure Up to 50 bar
Design Temperature Up to 300°C
Corrosion Allowance Per UG-25
Welding Standard ASME Section IX
Testing Hydrostatic and radiographic inspection as per ASME standards

ASME Sec VIII Div 1 Vessel, S32750 Shell testing reference

Test Type ASME Reference Purpose
Hydrostatic Test UG-99 Ensures pressure integrity by testing the vessel at 1.3 times the design pressure.
Radiographic Examination UW-51 Verifies the weld quality and detects internal discontinuities in critical areas.
Pneumatic Test UG-100 Optional test to check vessel integrity using compressed gas where water cannot be used.
Visual Inspection Appendix 4 Confirms the overall workmanship and compliance with the design specifications.
Material Certification UG-4 and UG-10 Ensures all materials meet the specified ASME/ASTM standards, including chemical and mechanical properties.

ASME Sec VIII Div 1 Vessel, S32750 Shell Testing Requirements

ASME Requirements Application in Vessel Design
Material Compliance The shell is constructed using S32750 duplex stainless steel, conforming to ASME SA-240.
Design Pressure and Temperature The vessel is designed to handle pressures up to 50 bar and temperatures up to 300°C, as per ASME Code rules.
Stress Analysis Calculations for maximum allowable stress are performed per UG-23 and related sections.
Welding Standards Welds comply with ASME Section IX, ensuring high-quality joint integrity.
Corrosion Allowance A corrosion allowance is added as required by UG-25, extending vessel service life.

ASME Sec VIII Div 1 Vessel, S32750 Shell with PWHT for Mining Blowdown System H₂S Environments


Product Tags:

ASME Section VIII Division 1

      

Steam Blow Back Pressure Vessel

      

S32750 Shell Pressure Vessel

      
Quality ASME Sec VIII Div 1 Vessel, S32750 Shell with PWHT for Mining Blowdown System H₂S Environments for sale

ASME Sec VIII Div 1 Vessel, S32750 Shell with PWHT for Mining Blowdown System H₂S Environments Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: YUHONG HOLDING GROUP CO., LTD
*Subject:
*Message:
Characters Remaining: (0/3000)